Loading the Low-Carbon Energy IslandCCS | The complete solution blueprint
Colour is only the first cue: solid lines, dashes, waves, bubbles and vehicle markers together tell the flows apart. Light flows switch on only in their own mode.
This island is an illustrative model. Official figures depend on regulators’ opinions, third-party testing and verification documents.
| Flow | Origin → Destination | Material | Transport |
|---|
The Low-Carbon Energy Island is an illustrative interactive 3D map by CCS (Carbon Cycle Solutions). Ten areas explain the full biomethane process: food waste, livestock manure and wastewater sludge are digested into biogas in the Conversion Park, upgraded to biomethane (renewable natural gas, RNG) in the Purification Park, and delivered every month by the Sustainability Park to the Semiconductor Park, the Corporate Park and the Airport. The CCS Hub in the centre handles integrated planning and MRV data.
Biomethane is a gas fuel produced by cleaning and upgrading biogas from anaerobic digestion of organic waste to increase methane concentration. Internationally, it is also called renewable natural gas (RNG).
Biogas comes directly from digestion and contains substantial carbon dioxide and impurities. Biomethane is cleaned and upgraded biogas with a high methane concentration and low impurity levels, suitable for delivery and use as fuel.
Biogas power generation converts biogas into electricity for the grid. Biomethane upgrades biogas into fuel delivered directly to industrial users, with complete records traceable from feedstock to delivery.
The hub integrates feedstock sources, pre-treatment, anaerobic digestion, gas purification and delivery, collects metering data from every park to build MRV records, and works with regulators, third-party verifiers, investors and corporate users.
Food waste is collected, weighed, sorted, shredded and separated from oil and water, then conditioned into an organic slurry and piped to the Conversion Park. Livestock manure is collected and sent to the Conversion Park. Wastewater sludge is piped to the Conversion Park, and the Wastewater Park also illustrates on-site combustion for power generation.
Digesters ferment the feedstock in a sealed, oxygen-free environment; their membrane roofs rise and fall with gas production, and mixers keep each tank uniform. Fresh biogas is not yet biomethane: it still contains carbon dioxide and impurities. Digestate is separated and reused, and wastewater sludge is brought back into the resource loop.
Advanced gas cleaning removes sulfur compounds, siloxanes and VOCs, and PSA adsorption towers adsorb and purify in sequence.
Biomethane is compressed, stored and quality-checked before delivery. High-pressure gas trucks are loaded, weighed and dispatched with records, making fixed monthly deliveries to the Semiconductor Park, the Corporate Park and the Airport.
The Semiconductor Park receives delivered RNG to support supply-chain decarbonization disclosure; companies in the Corporate Park use RNG as a low-carbon fuel option; and the Airport points toward converting biomethane into sustainable aviation fuel (SAF), a low-carbon aviation fuel. Delivery and usage records feed into MRV.
The project’s RNG quality design targets are a methane concentration of at least 99%, sulfur compounds, siloxanes and VOCs below 30 ppbv, and carbon dioxide at or below 1%. These are design targets; actual quality is confirmed by third-party test reports.
Depending on demand and site conditions, options may include tank trucks, tube trailers or on-site supply. Compression or storage requires case-by-case confirmation under applicable safety regulations, including combustible high-pressure gas requirements. On the island, high-pressure gas trucks cross the sea bridge to make fixed monthly deliveries to the Semiconductor Park, the Corporate Park and the Airport, as an illustration.
After solid–liquid separation and treatment, digestate liquid is reused for pre-treatment conditioning, feed dilution and on-site cleaning. Biogenic carbon dioxide separated during purification is captured, purified and reused. Digestate is dewatered and stabilized into organic fertilizer or soil conditioner and returned to farmland. Every loop needs metering and records before it can support MRV and ESG claims.
Yes. Biomethane (also called renewable natural gas, RNG) can be included in a company’s greenhouse gas inventory and deliver real emission reductions. Under ISO 14064-1:2018, the GHG Protocol and the Greenhouse Gas Emissions Inventory Guidelines issued by Taiwan’s Ministry of Environment, biomethane is treated as a biofuel: biogenic CO₂ from its combustion is calculated and listed separately rather than added to the emissions total, while methane (CH₄) and nitrous oxide (N₂O) from combustion are still counted. Replacing natural gas or other fossil fuels with biomethane therefore directly lowers Scope 1 (Category 1) fossil-fuel emissions. The reduction a company can claim rests on MRV records, including delivered volume, heating value, gas quality and proof of origin, and on third-party verification.
MRV means measurement, reporting and verification. It enables third parties to review and have confidence in emissions-reduction benefits. CCS builds MRV into every park from the design stage: feedstock source and weight, biogas volume and composition, methane concentration after purification, delivered volumes and the basis for fossil-fuel substitution are all auditable records. Certification and carbon credits are still under assessment; whether they apply, and whether they can be obtained, depends on verification results.
CCS is currently in site development and engineering planning, advancing regulatory confirmation, technology validation, feedstock supply and commercial contracts in parallel. Please contact us for the latest progress.
The Low-Carbon Energy Island is an illustrative model. It does not represent an actual site layout, throughput or any permit already obtained. Delivery methods for biomethane are confirmed case by case with the competent authorities.
Keep reading: What is biomethane? | FAQ | The full process | MRV and verification | Industrial supply | Contact CCS